Media item
Work on the locks almost finished
closeLicense
Creative Commons – Attribution-Share Alike
You are free to remix, tweak, and build upon this work even for commercial purposes, as long as the author or licensor is credited, and new works are licensed under identical terms.
closeDownload
- OGV (320x240, sd 5.7 MB): 29/29935.29868.WEEKNUMMER364-HRE0000D9CA.ogv
- OGV (352x288, hd 12.8 MB): 29/29938.29868.WEEKNUMMER364-HRE0000D9CA.ogv
- MP4 (320x240, sd 12.7 MB): 29/29941.29868.WEEKNUMMER364-HRE0000D9CA.mp4
- MPG (352x288, source 14.3 MB): 29/29868.WEEKNUMMER364-HRE0000D9CA.mpg
Week number 36-42
Newsreels in which Dutch subjects of a certain week are presented.
Report on the state of affairs at the construction of the locks near Vreeswijk. SHOTS: - several shots of the construction site and construction activities on the locks and lock installations that are being realized; several of the ext.; - several shots of the visit of Minister of Transport, Public Works and Water Management esquire O.C.A. van Lidth de Jeude and company, consisting of a.o. mayor of Amsterdam W. de Vlugt and the construction site; 00:57 group of men walk by with a.o. Van Lidth de Jeude (far left) and De Vlugt (right with beard and goatee).
- Creator:
- Polygoon-Profilti (producer) / Netherlands Institute for Sound and Vision (curator)
- Publication date:
- 3 October 1936
- Length:
- 01:23
- Type:
- video
- Original format:
- User:
- Netherlands Institute for Sound and Vision




